Success
Your message has been sent to an agent.
Floor plan
3LDK
Building size
228.85m²
Land size
632.90m²
This is a large newly built mansion of approximately 223m² (including garage) currently under construction in the Kobutsuyama area, which is within walking distance of Nakakaruizawa Station and still retains plenty of greenery.
1st floor 170.89㎡ (garage 43.06㎡) 2nd floor 57.96㎡ Main facilities: floor heating, wood stove, dishwasher/dryer, air conditioner, induction cooking heater, earthen floor salon, walk-in closet, pantry, wood deck, shoe IC Building confirmation number: 23NJU-10-00826
Landscape Law: Karuizawa Town Nature Conservation Measures Guidelines
Last updated
18/08/2024 10:21
Next update date
01/09/2024 10:21
Listed price
¥175,000,000 (01/05/2024)
Est. monthly payment
¥518,844/month
Time on Viila
135 days
Transaction type
Brokerage (General)
Property type
House
Floor plan
3LDK
Building size
228.85 m² (69.23 tsubo)
Land size
632.90 m² (191.45 tsubo)
Building Coverage Ratio
60%
Building Coverage Ratio
379.74 m² (Estimated)
Floor Area Ratio
160%
Floor Area Ratio
1,012.64 m² (Estimated)
Water supply
Public
Electricity supply
Chubu Electric
Sewage
Public
Gas supply
None
Land type
Flat
Land classification
Residential land
Zoning
Category Ⅰ residential zone
Building type
Newly built
Building Materials
Wood
Land rights
Ownership
Private road burden area
45㎡
Main access roads
北側にて幅員約4mの公道に約16.5m接道 東側にて幅員約5mの公道に約34m接道
Current condition
建築中(2024年11月完成予定)
Delivery time
2024年11月下旬
Direction
East
Sign in to show exact location
By logging in, you agree to our Terms of Use and to receive Viila emails & updates and acknowledge that you read our Privacy Policy.
When signing a contract
When settling the remaining fees
Contract stamp tax, brokerage fee and Tax payment are calculated from the displayed price. It may differ at the time of actual transaction. Separately, management fees, property taxes, etc. will be settled by the seller and the buyer starting from the delivery date.
Sign In to comment
By logging in, you agree to our Terms of Use and to receive Viila emails & updates and acknowledge that you read our Privacy Policy.
Payment Calculator
Listed by